Virginia Waters, Surrey 

Project Highlights 

planned minimal deliveries within private gated community 
delivered via 300+ metre long path with no vehicle access 
achieve large open span with large glazed areas 

The Background 

Dynamic was contacted with a challenging project in terms of design, access and timescales. 
 
Working with the project architect we quickly provided solutions to overcome the lack of vehicluar access, design intent and the time available for manufacture and delivery.  

Our Solution 

Working with the prestigious Belevedere Homes we provided a Design (DfMA), Manufacture and Installation package: 
developed a hybrid SIPs, steel and timber structure  
modelled each component to solve logistical challenges 
performance to meet low energy local authority targets 
achieved design changes post manufacture  

The Outcome 

A stunning building comprising lounge, bar, golf simulator, wine room, office, toilet, storage and lobby set within an idyllic woodland setting. 

 Ready to discuss your project? 

Ready to discuss your project? 

 
 
 

Interested in more news and insight? 

 
 
 
Our site uses cookies, including for advertising personalisation. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings