Ultra low energy holiday homes with wellbeing and connection to nature
Client: Developer
Package: High Performance Envelope
Building Systems: SIPs
Type of Building: 19 x Holiday Homes
Energy Saving: Fabric First
The Background
This site had secured planning but remained commercially stalled.
Traditional holiday home approaches were unable to provide a solution that met the requirements and the scheme remained unviable despite strong end-user demand.
Dynamic Delivery
Our solution is removing cost, programme and performance uncertainty upfront by applying a digitally driven, MMC-led delivery designed to unlock viability before construction commences:
Digitally defined to lock in cost, performance and interfaces
Ultra-low U-values without inflating build complexity
Reducing programme risk, labour exposure and cashflow pressure
Lowering long term running costs
Supporting wellbeing, sustainable occupancy