Ultra low energy holiday homes with wellbeing and connection to nature 

Client: Developer 
Package: High Performance Envelope  
Building Systems: SIPs 
Type of Building: 19 x Holiday Homes 
Energy Saving: Fabric First 

The Background 

This site had secured planning but remained commercially stalled. 
 
Traditional holiday home approaches were unable to provide a solution that met the requirements and the scheme remained unviable despite strong end-user demand. 

Dynamic Delivery 

Our solution is removing cost, programme and performance uncertainty upfront by applying a digitally driven, MMC-led delivery designed to unlock viability before construction commences: 
 
Digitally defined to lock in cost, performance and interfaces 
Ultra-low U-values without inflating build complexity 
Reducing programme risk, labour exposure and cashflow pressure 
Lowering long term running costs  
Supporting wellbeing, sustainable occupancy 

 Ready to discuss your project? 

Ready to discuss your project? 

 
 
 

Interested in more news and insight?