South-West based Property Consultancy selects Dynamic as specialist offsite construction partner. 
Dynamic Build UK will provde Design for Manufacture and Assembly (DfMA) services to design the offsite manufactured Structural Insulated Panel system (SIPs) for this standardised learning space. 
 
The requirements for the Design for Manufacture and Assembly phase include: 
optimise and digitally design the components for the structure (BIM) 
minimising carbon dioxide emissions and energy use during construction and use  
achieve low u-values and minimise thermal bridging 
detailing and strategy to achieve air tightness targets 
simplifying the installation and activities for the follow on trades 
 
“Every Dynamic structure and construction project includes a comprehensive Design for Manufacture & Assembly (DfMA) phase and during the pandemic we added a standalone DfMA solution for clients. We look forward to working with a leading multidisciplinary property consultancy to maximise efficiencies, simplify construction and provide transparency to the clients project team" Gavin Wilkes, Director. 
 
If you would like more information on the Dynamic Build UK approach please call 0121 272 7457 or email info@dynamicbuilduk.com 
Tagged as: Education
Share this post:
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings