Making MMC Work
Modern Methods of Construction (MMC) projects succeed or fail not because of the system chosen, but because of how the critical interfaces are designed, co-ordinated and delivered.
Controlling the Interfaces
Dynamic Build Group specialises in the integration of performance critical systems where MMC projects most often encounter risk:
foundations align with the superstructure
sequencing is controlled, not improvised
airtightness strategies are protected on site
energy systems are designed alongside fabric
These systems are are fundamental to build quality, compliance and long term performance.
We're an integrator...
who take responsibility for integrating performance systems!
Foundations Interfaces
Foundations are a performance critical interface, not just a groundworks package.
We focus on:
optimum foundations for ground conditions
tolerance control aligned to MMC superstructures
correct sequencing for SIPs, timber frame and hybrid systems
load paths and bearing details
early co-ordination between groundworks and MMC delivery
Getting this right protects programme, build quality and envelope performance from day one.
Superstructure Systems
Airtightness is achieved through design, detailing and site discipline.
Our approach includes:
structural engineering and detailing
structural load transfer between systems
building regulations and compliance
sequencing between frame, envelope and finishes
This reduces defects and protects the overall performance of the building.
Airtightness
Airtightness is achieved through design, detailing and site discipline.
Our approach includes:
airtightness strategies developed alongside system selection
clear responsibility for junctions and penetrations
protection of airtight layers
co-ordination with windows, doors and services
This ensures airtightness performance is delivered in practice, not just on drawings or screens.
Energy & Low Carbon Systems
Energy systems only perform better when they are integrated with the fabric, not added later.
We co-ordinate:
heating and ventilation strategies
MVHR and heat pump integration
hot water and energy storage solutions
sequencing between fabric completion and system installation
This reduces rework, improves efficiency and supports low and zero-energy outcomes.
Discuss Your MMC Project Integration
If you want clarity on how foundations, airtightness and energy systems are integrated into your MMC project, we are happy to talk.
Proven, structured MMC delivery system
Our five-stage Dynamic MMC Delivery System, which is proven to remove risk at the critical interfaces.