Making MMC Work 

Modern Methods of Construction (MMC) projects succeed or fail not because of the system chosen, but because of how the critical interfaces are designed, co-ordinated and delivered. 

Controlling the Interfaces 

Dynamic Build Group specialises in the integration of performance critical systems where MMC projects most often encounter risk: 
 
foundations align with the superstructure  
sequencing is controlled, not improvised 
airtightness strategies are protected on site 
energy systems are designed alongside fabric 
 
These systems are are fundamental to build quality, compliance and long term performance. 
 
 
 

We're an integrator... 

who take responsibility for integrating performance systems! 
 
 
 

Foundations Interfaces 

Foundations are a performance critical interface, not just a groundworks package. 
 
We focus on: 
 
optimum foundations for ground conditions  
tolerance control aligned to MMC superstructures 
correct sequencing for SIPs, timber frame and hybrid systems 
load paths and bearing details 
early co-ordination between groundworks and MMC delivery 
 
Getting this right protects programme, build quality and envelope performance from day one. 

Superstructure Systems 

Airtightness is achieved through design, detailing and site discipline. 
 
Our approach includes: 
 
structural engineering and detailing 
structural load transfer between systems 
building regulations and compliance 
sequencing between frame, envelope and finishes 
 
This reduces defects and protects the overall performance of the building. 

Airtightness  

Airtightness is achieved through design, detailing and site discipline. 
 
Our approach includes: 
 
airtightness strategies developed alongside system selection 
clear responsibility for junctions and penetrations 
protection of airtight layers  
co-ordination with windows, doors and services 
 
This ensures airtightness performance is delivered in practice, not just on drawings or screens. 

Energy & Low Carbon Systems 

Energy systems only perform better when they are integrated with the fabric, not added later. 
 
We co-ordinate: 
 
heating and ventilation strategies 
MVHR and heat pump integration 
hot water and energy storage solutions 
sequencing between fabric completion and system installation 
 
This reduces rework, improves efficiency and supports low and zero-energy outcomes. 

How This Supports MMC Systems Delivery 

Our integrated approach underpins every system we deliver: 

SIPs for speed, accuracy and airtightness 

Timber frame for flexibility and efficiency 

Discuss Your MMC Project Integration  

If you want clarity on how foundations, airtightness and energy systems are integrated into your MMC project, we are happy to talk. 

Proven, structured MMC delivery system 

Our five-stage Dynamic MMC Delivery System, which is proven to remove risk at the critical interfaces. 

Define Performance targets, buildability, compliance and cost reality set upfront. 

Manufacture Accredited MMC systems digitally designed, engineered, supplied and delivered to site.  

Foundations Groundworks aligned precisely to superstructure and airtightness requirements. 

Install Precision installation of SIPs, timber frame or hybrid systems by our specialist teams. 

Build Shell or turnkey delivery with performance sign-off, compliance and quality control. 

Why Clients Vaue This Approach 

Accelerated delivery 
Reduced progragmme risk 
✅ Predictable performance 
✅ Reduced energy costs  
✅ Faster return on investment