Early Years Extension 

Details 

Sector: 
Education 
Typology: 
Early Years 

MMC Categories 

Category 2: Pre-manufactured 2D structural 
Category 3: Pre-manufactured components 
Category 6: Building product improvements 

Challenge 

The academy had a requirement to replace a dilapidated mobile nursery building with a sustainable modern building that was linked to the existing traditionally constructed nursery building.  
The 60 place replacement nursery consists of an open early years space, sleep room, kitchen, office, toilets and a staff room with clear access to a playground, soft play area and landscaping. 

Solution 

A hybrid SIPs walls and timber cassette roof structure to achieve the ā€˜Lā€™ shaped design. 
Delivery solution to overcome a challenging 2.6 metre wide temporary opening in neighbours brick wall. 
Replaced proposed gas heating and seperate cooling system with eco heating and cooling system. 
The external walls are finished in brick slip cladding to match the adjacent traditionally built nursery. 
 
 
 

Let's get started! 

Modern methods of construction specialists | Education sector expertise | Complete build solutions 
 
 
 
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings