Dynamic Build Group are delighted to have designed, manufactured and installed our latest hybrid structure project. 
This pavilion building is set within an idyllic woodland and was delivered wirth a hybrid SIPs and steel frame solution to meet the stunning design. 
 
Our dynamic team optimsed Modern Methods of Construction overcome complex logistical and construction challenges: 
 
modelled every component within the structure to simulate installation with no vehicle access to construction area 
selected the best components and building systems to achieve open span and large glazed openings 
SIPs to provide high performance with a slimline wall structure 
 
“We continue to deliver bespoke architect designed buildings and find innovative solutions to simplifying the delivery of complex projects. This perfectly combines SIPs, steel and timber to create what will be a stunning recreational space." Gavin Wilkes, Director. 
 
If you would like more information on the Dynamic Build Group approach please call 0121 724 0099 or email info@dynamicbuilduk.com 
Share this post:
Our site uses cookies, including for advertising personalisation. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings